Michael Rybovich presents its latest launch the hull number eight 62 Sportfisherman. Titled m/y Perlamar this latest Michael Rybovich 62 is again designed in house, and was keel laid in the fall of 2021 taking three years to complete, with its first launch coming in September 2024. The 62 Sportfisherman features a three cabins sleeping eight layout and a tackle storage room to port side upon arrival on the lower deck. The master stateroom is located at midships to starboard, with a guest cabin with four berths forward; bunk berths to port and double bed to starboard, and a third cabin with bunks to port side. All three cabins have a private bathroom. The main deck of Michael Rybovich eight hull comes a bit different to the sportfisherman standard, with an astern galley layout, day head to port, small dinette for four persons to port side and relax L-shaped sofa lounge located forward to starboard. Michael Rybovich and Sons 62 Sportfisherman Hull #8 is powered by twin MTU 1920hp.
Technical Data:
LOA - 18.89 m (62ft)
Beam - 5.63 m
Draft - 1.67 m
Displacement - 35380 kg
Fuel Capacity - 8555 l
Water Capacity - 1400 l
Accommodation - eight berths in three cabins
Engines - 2 x MTU 12v2000 M96L 1920hp
Propulsion - line shaft
Speed -
Construction - cold moulding with epoxy resins
Project - Michael Rybovich and sons design and naval architecture
No comments:
Post a Comment